HUB IS GETTING READY FOR COMPLETION

By August 20, 2019News

This summer has been a busy time at HUB! With only 3 units left and occupancy on track for this October, our industrial real estate development in Port Coquitlam is buzzing with activity as we near completion of our 16 strata warehouse units.

With all the work that’s been done in the past few weeks, we’re excited to be heading into the home stretch for the building construction. Our crew is now diligently working to finalize both the exterior and interior of the building. The site work is also in motion as our crew prepares for paving and sidewalks begin to be poured.

Checkout a few progress photos below:

 

The facade painting is now down to the final touches, and installation of the cladding on canopies and exterior doors has just been finalized.

    

On the building’s interior, the drywall is being finalized in the next few days, along with the washroom flooring and plumbing fixtures.

   

ARE YOU CONSIDERING INDUSTRIAL WAREHOUSE SPACE IN METRO VANCOUVER?

With only 3 units left, don’t miss your chance to invest in the future of your business, now’s the time to contact our team for more information.

HUB is centrally located in Port Coquitlam providing easy access to everywhere in the Lower Mainland – just minutes off Lougheed Highway, Mary Hill Bypass, Highway 1, and the South Fraser Perimeter Road. With building specifications to meet the needs of your growing business, these concrete tilt-up warehouse spaces will offer 26’ clear height ceilings, 500lb ground floor load capacity, both dock and grade loading for every unit, and more.

Register online or call the sales team today. We look forward to hearing from you!